• Firm Overview
  • Professional Services
    • CRITICAL PATH METHOD (CPM) SCHEDULING SERVICES
    • RISK MANAGEMENT SERVICES
    • LOCATION-BASED SCHEDULING
    • DELAY AND TIME IMPACT ANALYSIS
    • 4D SCHEDULING
  • DRONE SERVICES
    • 3D IMAGING
    • AERIAL INSPECTION
    • CONSTRUCTION PROGRESS
  • Turbo | Chart
  • Contact

Professional Services

4D SCHEDULING

4D Schedule with Synchro

 

Communication is key to project success, and being able to show stakeholders the schedule in 3D is groundbreaking. When we combine a 3D model with a CPM schedule, a new dimension called 4D Building Information Modeling (4D Schedule) occurs. 4D scheduling combines a construction schedule (time) with the model (location) to provide precise and useful construction project information for the team. 4D scheduling visualization incorporates start and finish dates for installing construction components and reveals their importance in relation to the overall project. The lack of visualization of the CPM schedule has been a challenge for many years, and Overall Consulting removes those challenges by specializing in bringing clarity to the stakeholders using 4D scheduling.

Specializing in the art of communicating the schedule to people by defining activities, resources, logic, and priorities through information technology and advanced scheduling practices

Contact Info

  • Sacramento, California (Serving throughout the United States)

  • 951-258-9265

  • scarrico@overall-consulting.com

Connect With Us

  • Copyright ©
  • Overall Consulting, LLC
  • All rights reserved.