• Firm Overview
  • Professional Services
    • CRITICAL PATH METHOD (CPM) SCHEDULING SERVICES
    • RISK MANAGEMENT SERVICES
    • LOCATION-BASED SCHEDULING
    • DELAY AND TIME IMPACT ANALYSIS
    • 4D SCHEDULING
  • DRONE SERVICES
    • 3D IMAGING
    • AERIAL INSPECTION
    • CONSTRUCTION PROGRESS
  • Turbo | Chart
  • Contact

Professional Services

CRITICAL PATH METHOD (CPM) SCHEDULING SERVICES

 

Critical Path Method (CPM) Scheduling Services

 

Overall Consulting’s consultants are specialized in working with owners, designers, contractors, and subcontractors for their Critical Path Method (“CPM”) construction scheduling needs. We analyze the plan, follow contractual obligations and present guidance options for informed and proactive decisions throughout the project lifecycle. Construction projects have a lot of moving pieces. We work with the team to put the plan together with a CPM schedule through centralized communication, enhanced quality control, and best project planning practices, which creates a schedule that is proven to be time and cost-efficient for your construction project.

Specializing in the art of communicating the schedule to people by defining activities, resources, logic, and priorities through information technology and advanced scheduling practices

QR Code

Contact Info

  • San Diego, California (Serving throughout the United States)

  • 951-258-9265

  • scarrico@overall-consulting.com

Connect With Us

  • Copyright ©
  • Overall Consulting, LLC
  • All rights reserved.