LOCATION BASED SCHEDULING

images

Location-Based Scheduling (“LBS”) or Line of Balance (“LOB”) scheduling utilizes your current CPM schedule for better resource control by measuring, analyzing, and presenting scopes of work or activities relating to time against the project plan. The advantage of an LBS is they present the entire schedule on a single page, which displays the process, status, production rates, background, timing, and phasing of the project activities, thus providing management with measuring tools for success. At Overall Consulting, we take your current CPM schedule, which is typically 20 pages or more, and create a single page LBS typically within one day or better to analyze the plan and resource requirements of the project.